Kizomba A

PROJECT DATA
Client ExxonMobil
Award Date July 2001
Completion Date March 2005
Location Angola, Block 15
Water Depth 3,863 ft
Hull Type ETlp® - 4
Operating Draft 112 ft.
Column Dimensions 47.5 ft sq x 130 ft high
Pontoon W x H 34 ft x 29.5 ft
Topside Dimensions 240 ft x 200 ft x 45 ft
Total Payload 22,900 s. tons
Displacement 58,480 s. tons
Mooring Type 8x32" OD tendons
Risers 36 x TTR
10 ¾” Single cased
Production Capacity Wellhead platform only, no production
Troughput to FPSO 400 MMscfd
250 Mbopd
Export Pipelines None, to FPSO
   
Project Execution Overview
PMT ABB Lummus Global (patent now owned by FloaTEC, LLC)
Hull Engineering ABB Lummus Global (patent now owned by FloaTEC, LLC)
Topsides Engineering ABB Lummus Global (patent now owned by FloaTEC, LLC)
Mooring Engineering ABB Lummus Global (patent now owned by FloaTEC, LLC)
Riser Design ABB Lummus Global (patent now owned by FloaTEC, LLC)
Equipment Procurement ABB Lummus Global (patent now owned by FloaTEC, LLC)
Hull Fabrication Daewoo (subcontracted)*
Topsides Fabrication Grootint Holland
Drilling Rig Sonamer (Pride Int) (subcontracted)*
Tendon Fabrication Gulf Marine Fab (subcontracted)*
Pile Fabrication Sonamet (subcontracted)*
Pile/Tendon Installation Stolt/Heerema
ETLP Installation Heerema
* Subcontract to ABB LGI/Heerema Alliance
   

Scope/Description:

  • Project Management
  • Engineering & Procurement and Construction Management (EPCM)
  • Topsides, Drill Rig, Hull & Mooring, mooring foundations, riser systems detailed engineering design
  • Procurement of all topsides and marine systems equipment, mooring systems and risers systems equipment and components
  • Hull and topsides fabrication, assembly, outfitting, integration, pre-commissioning and commissioning.
  • Transportation to site, hook up and installation and final offshore commissioning.

Innovations/Technology:

  • Turnkey EPCI delivery
  • First floating dry tree unit offshore Africa
  • First tension leg platform offshore Africa
  • Fast track schedule and delivery (28 months)
  • Largest number of top tensioned production risers on a floating dry tree unit (36 risers)
  • First full service drilling rig capable of horizontal and directional drilling and simultaneous drilling and production operation on a floating dry tree unit.
  • Closest coupled dry tree unit with an FPSO (less than 200 m)
  Click on images below to view larger.
 
 
 
     